Chengdu Forster Technology Co., Ltd.

Integrity, pragmatism, innovation, and provide the best solution for your hydro power plant.

Manufacturer from China
Active Member
5 Years
Home / Products / Low Head Water Turbine /

3 Phase Permanent Magnet Alternator Hydroelectric Power Station ISO Certificate

3 Phase Permanent Magnet Alternator Hydroelectric Power Station ISO Certificate

Ask Latest Price
Brand Name :forster
Model Number :502-40
Certification :CE/TUV/ISO9001/From-E
Place of Origin :Sichuan, China (Mainland)
MOQ :>=1 Units
Price :Negotiable
Payment Terms :L/C, T/T
Supply Ability :25 Set/Sets per Month
Delivery Time :120days
Packaging Details :Wood Box
water head :5.5-21m
flow rate :0.6-1.17m3/s
Certificate :ISO9001/CE/TUV
Material :Stainless Steel Runner
Rated speed :500-1500r/min
Voltage :380v,400v
Application :hydro power plant
keyword :Water Turbine 3 Phase Permanent Magnet Alternator
Port :shanghai/shenzhen
Contact Now

Add to Cart

Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
View Product Description

Low Head Water Turbine 3 Phase Permanent Magnet Alternator Hydroelectric Power Station

Product Description

Bulb tubular turbine is a new hi-tech product. It is well suitable for hydropower plants with water head ranging from 2 m to 10 m and unit capacity below 15MW. It has the following particular advantages: Its efficiency is higher than shaft-extension type tubular units and axial flow units; its cost is lower than axial flow units and bulb tubular units, and it is convenient to operate and maintain. Pit type tubular turbine is divided into fixed blade type (GD) and moveable blade type (GZ).

Product features :

1. Bulb tubular power plant from influent to effluent direction basically is communicated in axial direction.If the buld turbine hydropower station water inlet outlet pipesare not turning,simple shape,flow channel to reduce the hydraulic loss,convenient construction.

2. Tubular turbine with high flow ability high specific speed,so in the head and power under the same conditions tubular turbine propeller diameter than about 10%;

3. Bulb tubular turbine hydropower station has the advantages of compact structure,compared with the same specifications of Kaplan turbine to its relatively small size,can be arranged in the dam,cancel diversion system complex,reduce the workshop building area,reduce the amount of excavation and concrete plant,according to the analys is of revevant data,civil construction cost can save 20%-30%;

4. Bulb tubular turbine for reversible pump turbine,the flow has no sharp corners,so that the pump and turbine can obtain good hydraclic properties.As for can with bidirectional power,bi-directional pumping and two-way drainage functions six tidal power sation.Therefore,it is suitable for the comprehensive development and utilization of low head water resource;

5. Bulb tubular hydropower station in general than the vertical axial flow type hydropower station construction period is short,fast effect.

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Bulb tubular product parameters:

ZD760-LM-80 Hydro Kaplan Tubine Performance Data And Supporting Table
Model Turbine Parameters Generator Parameters Driving mode Speed Way
Design head(m) Under the design head Design speed (r/min) Model power
(kw)
Rated
voltage
(v)
Rated
electric current
(A)
Rated
speed
(r/min)
The run
way speed
(r/min)
Manually
Flow rate (m3/s) The output(kw)
ZD760-LM-80 = 4-5° 2.2 1.76 33.5 334 SF26-6/423 26 400 46.9 1000 2000 Belt TT-750
2.9 2.02 50.5 382 SF40-6/423 40 400 72.2 1000 2000 Belt TT-750
3.6 2.25 70.1 429 SF55-6/493 55 400 99 1000 2000 Belt TT-750
4.3 2.46 91.5 466 SF75-6/493 75 400 136 1000 2000 Belt TT-750
5 2.65 114.8 503 SF100-12/850 100 400 181 500 1000 Straight league TT-750
5.2 2.67 120 500 SF100-8/590 100 400 181 750 1500 Belt TT-750
6 2.74 142 500 SF125-12/850 125 400 226 500 1000 Straight league TT-750
ZD760-LM-80 = + 1 0° 2.1 1.94 34.2 334 SF26-6/423 26 400 46.9 1000 2000 Belt TT-750
2.6 2.16 47.1 382 SF40-6/423 40 400 72.2 1000 2000 Belt TT-750
2.7 2.19 49.7 429 SF40-6/493 40 400 72.2 1000 2000 Belt TT-750
3.3 2.44 67.7 466 SF75-6/493 75 400 136 1000 2000 Belt TT-750
4.3 2.68 90 503 SF75-6/493 75 400 136 1000 2000 Belt TT-750
5 3 126 500 SF100-6/590 100 400 181 1000 2000 Gear TT-750
5.5 3.13 144.7 500 SF125-12/850 125 400 226 500 1000 Straight league TT-750
ZD760-LM-80 = + 1 5° 2 2.1 34.2 301 SF26-6/423 26 400 46.9 1000 2000 Belt TT-1500
2.6 2.37 50.2 340 SF40-6/423 40 400 72.2 1000 2000 Belt TT-1500
3.2 2.65 69.1 380 SF55-6/493 55 400 99 1000 2000 Belt TT-1500
3.9 2.92 92.8 429 SF75-6/493 75 400 136 1000 2000 Belt TT-1500
4.8 3.06 120.1 429 SF100-6/590 100 400 181 1000 2000 Gear TT-1500
5.4 3.13 141.2 500 SF125-12/850 125 400 226 500 1000 Straight league TT-1500
6 3.54 174 500 SF160-12/850 160 400 288 500 1000 Straight league

3 Phase Permanent Magnet Alternator Hydroelectric Power Station ISO Certificate

3 Phase Permanent Magnet Alternator Hydroelectric Power Station ISO Certificate

Design schematic:

3 Phase Permanent Magnet Alternator Hydroelectric Power Station ISO Certificate

Company Information

Our Workshop:

Packaging & Shipping

Advantages:

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4, Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6, How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7, Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website:www.fstgenerator.com

China 3 Phase Permanent Magnet Alternator Hydroelectric Power Station ISO Certificate for sale

3 Phase Permanent Magnet Alternator Hydroelectric Power Station ISO Certificate

Inquiry Cart 0