Chengdu Forster Technology Co., Ltd.

Integrity, pragmatism, innovation, and provide the best solution for your hydro power plant.

Manufacturer from China
Active Member
6 Years
Home / Products / Francis Turbine Generator /

Movable Guide Vane Francis Turbine Generator 100kw - 1.5mw Easy Installation

Contact Now
Chengdu Forster Technology Co., Ltd.
City:chengdu
Province/State:sichuan
Country/Region:china
Contact Person:MrsNancy
Contact Now

Movable Guide Vane Francis Turbine Generator 100kw - 1.5mw Easy Installation

Ask Latest Price
Video Channel
Brand Name :Forster
Model Number :HL240C-WJ-50
Certification :CE/TUV/ISO9001
Place of Origin :Sichuan, China (Mainland)
MOQ :1 Set/Sets
Price :Negotiable
Payment Terms :L/C, T/T
Supply Ability :50 Set/Sets per Month
Delivery Time :180days
Packaging Details :wood box
Design head :15-40m
Design flow :1.43-4.6m3/s
Pipe diameter :DN2250-3200mm
Generator :Brushless excitation
Processing method :CNC machining / constant temperature annealing
Valve :Gate valves
Installation method :horizontal installation / vertical installation
Backup power :charger and rechargeable battery
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

All Stainless Steel Runner Movable Guide Vane Francis Turbine Generator For Hydro Power Plant

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features :

Francis turbine is a kind of counter-attack turbine, invented by American engineer Francis in 1849, also known as Francis turbine, or radial flow turbine. Water flows radially into the runner, and then flows out approximately axially. The runner consists of a crown, a ring and a blade.

Francis turbine has wide application head (about 20-700m), simple structure, stable operation and high efficiency, and is the most widely used type of turbine in modern times. The unit with a single capacity of 700 mw is put into operation in three gorges, and xiangjiaba adopts 800 mw mixed-flow unit.

Product parameters:

HL-WJ-Francis tubine generator unit Generator Gevernor or Regulating work Valve
Turbine
Type Water head(m) Discharge (m³/s) Speed (r/min) Power(kw) Efficiency(%)
HL240C-WJ-50 15 1.43 600 183 86.9 SFW160-10/740 YT-3000 Z941H-6Dg800
17 1.53 600 219.6 86.2 SFW200-10/740
20 1.64 750 280.9 87.1 SFW250-8/740
23 1.77 750 348.3 87 SFW320-8/850
27 1.92 750 438.4 86.1 SFW400-8/850
30 2.03 750 509.9 85.5 SFW500-8/850
36 2.21 1000 680.6 87.2 SFW630-8/990
40 2.34 1000 799.8 87.1 SFW800-6/1180
HL240C-WJ-60 13 1.91 500 213.4 87.7 SFW200-12/850 YT-3000 PDF6-WDDg1000
15 2.06 500 265.7 87.5 SFW250-12/850
18 2.25 600 349 87.5 SFW320-10/990
21 2.43 600 438.6 87.8 SFW400-10/990
24 2.61 600 534 86.9 SFW500-10/990
28 2.8 750 673 87.5 SFW630-8/990 YT-6000
32 2.99 750 816.6 86.9 SFW800-8/990
37 3.24 750 1023.4 87 SFW1000-8/990
40 3.37 750 1143.8 86.5 SFW1000-8/990
HL240C-WJ-71 18 3.14 500 489.6 88.2 SFW500-12/990 YT-3000 PDF6-WDDg1200
22 3.5 500 658.6 87.2 SFW630-12/1180
26 3.78 600 850 88.2 SFW800-10/1180
30 4.06 600 1051.1 88 SFW1000-10/1430
34 4.35 600 1268.1 87.3 SFW1250-10/1430
38 4.6 600 1498.4 87.4 SFW1600-10/1430

Product pictuers:

Movable Guide Vane Francis Turbine Generator 100kw - 1.5mw Easy InstallationMovable Guide Vane Francis Turbine Generator 100kw - 1.5mw Easy InstallationMovable Guide Vane Francis Turbine Generator 100kw - 1.5mw Easy Installation

Installation design drawings:

Movable Guide Vane Francis Turbine Generator 100kw - 1.5mw Easy Installation

Company Information:

Our Workshop:

Advantages:

Packaging & Shipping:

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website:www.fstgenerator.com

Inquiry Cart 0