
Add to Cart
Off Grid System With Automatic Black Excitation Hydro 500 Kw Francis Turbine For Hydro Power Plant
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features :
At present, the maximum applicable water head of the Francis turbine has reached 600m. The efficiency of the Francis turbine is high, but the relative structure is complex, and the operation and maintenance are more troublesome than the impact. The unit cost and cost are relatively high.
1. Suitable for low head and large flow;
2. Pressure inlet, pressure outlet; pipeline water, pipeline water.
3. The turbine is separated from the generator for easy maintenance and replacement of wearing parts.
4. The turbine has 3 separate bearings and 2 generators for more reliable structure.
5. The turbine bearing has an independent oil lubrication system, and the bearing life is longer.
6. Brushless excitation generator, no need to replace the carbon brush, maintenance is more convenient.
Product parameters:
HL-WJ-Francis tubine generator unit | Generator | Gevernor or Regulating work | Valve | ||||||
Turbine | |||||||||
Type | Water head(m) | Discharge (m³/s) | Speed (r/min) | Power(kw) | Efficiency(%) | ||||
HL240C-WJ-50 | 15 | 1.43 | 600 | 183 | 86.9 | SFW160-10/740 | YT-3000 | Z941H-6Dg800 | |
17 | 1.53 | 600 | 219.6 | 86.2 | SFW200-10/740 | ||||
20 | 1.64 | 750 | 280.9 | 87.1 | SFW250-8/740 | ||||
23 | 1.77 | 750 | 348.3 | 87 | SFW320-8/850 | ||||
27 | 1.92 | 750 | 438.4 | 86.1 | SFW400-8/850 | ||||
30 | 2.03 | 750 | 509.9 | 85.5 | SFW500-8/850 | ||||
36 | 2.21 | 1000 | 680.6 | 87.2 | SFW630-8/990 | ||||
40 | 2.34 | 1000 | 799.8 | 87.1 | SFW800-6/1180 | ||||
HL240C-WJ-60 | 13 | 1.91 | 500 | 213.4 | 87.7 | SFW200-12/850 | YT-3000 | PDF6-WDDg1000 | |
15 | 2.06 | 500 | 265.7 | 87.5 | SFW250-12/850 | ||||
18 | 2.25 | 600 | 349 | 87.5 | SFW320-10/990 | ||||
21 | 2.43 | 600 | 438.6 | 87.8 | SFW400-10/990 | ||||
24 | 2.61 | 600 | 534 | 86.9 | SFW500-10/990 | ||||
28 | 2.8 | 750 | 673 | 87.5 | SFW630-8/990 | YT-6000 | |||
32 | 2.99 | 750 | 816.6 | 86.9 | SFW800-8/990 | ||||
37 | 3.24 | 750 | 1023.4 | 87 | SFW1000-8/990 | ||||
40 | 3.37 | 750 | 1143.8 | 86.5 | SFW1000-8/990 | ||||
HL240C-WJ-71 | 18 | 3.14 | 500 | 489.6 | 88.2 | SFW500-12/990 | YT-3000 | PDF6-WDDg1200 | |
22 | 3.5 | 500 | 658.6 | 87.2 | SFW630-12/1180 | ||||
26 | 3.78 | 600 | 850 | 88.2 | SFW800-10/1180 | ||||
30 | 4.06 | 600 | 1051.1 | 88 | SFW1000-10/1430 | ||||
34 | 4.35 | 600 | 1268.1 | 87.3 | SFW1250-10/1430 | ||||
38 | 4.6 | 600 | 1498.4 | 87.4 | SFW1600-10/1430 | ||||
HL240C-WJ-84 | 17 | 4.3 | 375 | 634 | 88.3 | SFW630-16/1430 | YT-6000 | PDF6-WDDg1250 | |
20 | 4.67 | 375 | 799.9 | 87.3 | SFW800-16/1430 | ||||
24 | 5.12 | 428.6 | 1058.8 | 87.9 | SFW1000-14/143 | YT-10000 | |||
28 | 5.49 | 500 | 1338.7 | 88.8 | SFW1250-12/1430 | ||||
32 | 5.91 | 500 | 1631.9 | 88 | SFW1600-12/1730 | YT-18000 | |||
37 | 6.35 | 500 | 2005.9 | 87 | SFW2000-12/1730 | ||||
HL240C-L(W)J-100 | 20 | 6.48 | 300 | 1106.9 | 87 | SF1000-20/2150 | YT-10000 Or YWT-10000 YWT18000 | PDF6-WYDg1250 | |
25 | 7.4 | 375 | 1608 | 88.6 | SF1600-16/2600 | ||||
30 | 8.1 | 375 | 2070.7 | 86.8 | SF2000-16/2600 | ||||
34 | 8.63 | 428.6 | 2544 | 88.4 | SF2500-14/2600 | ||||
38 | 9.06 | 500 | 3016.6 | 89.3 | SF3200-12/2600 | ||||
HL240C-LJ-120 | 18 | 9.04 | 250 | 1389 | 87 | SF1250-24/2600 | YT18000 YWT18000 | PDF60-WYDg175 | |
22 | 9.93 | 300 | 1907.1 | 89 | SF2000-20/2600 | ||||
25.5 | 10.76 | 300 | 2369.1 | 88 | SF2000-20/2600 | ||||
29.5 | 11.58 | 333.3 | 2961.3 | 88.4 | SF2500-18/2600 | YT30000 YWT-30000 | |||
33.5 | 12.34 | 375 | 3607.9 | 89 | SF3200-16/2600 |
Product pictuers:
Installation design drawings:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website:www.fstgenerator.com