Chengdu Forster Technology Co., Ltd.

Integrity, pragmatism, innovation, and provide the best solution for your hydro power plant.

Manufacturer from China
Active Member
6 Years
Home / Products / Pelton Turbine Generator /

Automated Unit Small Pelton Turbine Generator ISO9001/CE/TUV Certificated

Contact Now
Chengdu Forster Technology Co., Ltd.
City:chengdu
Province/State:sichuan
Country/Region:china
Contact Person:MrsNancy
Contact Now

Automated Unit Small Pelton Turbine Generator ISO9001/CE/TUV Certificated

Ask Latest Price
Place of Origin :Sichuan, China (Mainland)
Brand Name :forster
Model Number :CJ13
Supply Ability :50 Set/Sets per Month
Packaging Details :Wood Box
MOQ :1 Set/Sets
Price :Negotiable
Certification :CE/TUV/ISO9001/From-E
Payment Terms :L/C, T/T
Delivery Time :90days
Designer head :110-160 m
Traffic :0.0709-0.0856 m/s
Design speed :932-1124 r/min
Power :62.9-110kw
Driving mode :Straight league,Between the united
Diameter :200mm
color :orange
type :water power
keyword :pelton turbine generator
certificate :ISO9001/CE/TUV
Port :shanghai/shenzhen
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Mini Hydro Turbine Pelton Generator For Hydro Power Plant

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features:

The impact turbine is a special hydraulic propulsion mechanism that draws a free jet with kinetic energy, rushes to the runner bucket, and rotates the runner to do work, thereby completing a hydraulic prime mover that converts water energy into mechanical energy. In the impact turbine, the difference between the working jet and the relative position of the runner and the number of work can be divided into a tapping turbine, a slanting turbine and a double-click turbine.

1.suitable for high head,small flow and flow changes in large runoff hydropower station.

2.With the power plant investment is small,compact units structure characteristics.

3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

4.Suitable for high head,small flow station in mountainous area.

5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

Product parameters:

CJ237-W-65/1x7.5 Hydro Tubine Performance Data And Supporting Table
Model Turbine Parameters Generator Parameters Driving mode Speed Way Water Intake
Design head(m) Under the design head Design speed (r/min) The power of generator Rated speed(r/min) Runaway speed(r/min) Vavel control Guide vane control Diameter (mm)
Flow rate (m3/s) The output(kw)
CJ237-W-65/1x7.5 50 0.134 53 410 55 750 1500 Direct connection or Belt connection automatic/Manual Z41H-2.5 300
60 0.148 69.7 150 55 750 1500 automatic/Manual
70 0.159 89.8 486 75 750 1650
80 0.17 108 520 100 500 900 automatic/Manual
90 0.181 129 550 125 600 1080
100 0.19 152 580 125 600 1080 automatic/Manual
110 0.199 174 610 160 600 1080
120 0.208 197 636 200 600 1080 automatic/Manual
130 0.214 220 662 200 600 1350
140 0.225 250 688 250 750 1350 automatic/Manual
150 0.233 279 713 250 750 1350
160 0.241 308 736 320 750 1350 automatic/Manual
170 0.248 355 758 320 750 1350
180 0.254 362 779 320 750 1350 automatic/Manual
190 0.262 390 800 400 750 1350
200 0.269 422 820 400 750 1350 automatic/Manual
210 0.275 448 840 400 750 1350
220 0.282 448 860 400 750 1350 automatic/Manual
230 0.288 518 880 500 1000 1800
240 0.294 557 900 500 1000 1800 automatic/Manual

Product pictuers:

Installation picture:

Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Inquiry Cart 0