
Add to Cart
High Efficiency Alternative Energy Hydropower Project Hydro Pelton Tubine Generator For Hpp
Specifications
Output: 1000KW—6000KW
Flow Rate: 1.01m³/s—2.03m³/s
Water Head: 150m—380m
Frequency: 50Hz/60Hz
Certificate: ISO9001/CE/TUV/From-E
Voltage: 400V/6300V
Efficiency: 92%-95%
Generator Type: SFW1250—6300
Generator: Brushless Excitation
Valve : Butterfly Valve
Runner Material: Stainless Seel
Volute Material: Carbon Steel
Product Features
With the in-depth development of water resources, there are many high-lying watersheds that need to be developed. For example, the Yarlung Zangbo River in China has a drop of more than 2,000 meters. It is unrealistic to build a dam at the same time (considering an international river at this time). Therefore, the impact turbine has become the first choice.Pelton turbines have the following main advantages
1. Adapt to the situation where the flow rate and head ratio are relatively small.
2. The weighted average efficiency is very high and has high efficiency throughout the operating range. In particular, the water bucket turbine is now advanced and can average more than 91% efficiency in the 30% to 110% load range.
3. Strong adaptability to head changes
4. It is also very suitable for the ratio of pipeline to head.
5. The amount of excavation is small.
6.suitable for high head,small flow and flow changes in large runoff hydropower station.
7.With the power plant investment is small,compact units structure characteristics.
8.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.
9.Suitable for high head,small flow station in mountainous area.
10.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.
Pelton turbine generator unit | Generator | Gevernor or Regulating work | Valve | |||||
Turbine | ||||||||
Type | Water head(m) | Discharge (m³/s) | Output(kw) | Speed (r/min) | Type | Capacity (kw) | ||
CJA475-W-125/2x14 | 137 | 1.541 | 1739 | 375 | SFW1600-16/2600 | 1600 | CJWT- II BWT-6000 | DN800 |
157 | 1.662 | 2151 | SFW2000-16/2600 | 2000 | ||||
183 | 1.783 | 2688 | 428.6 | SFW2500-14/2600 | 2500 | |||
214 | 1.941 | 3422 | SFW3200-14/2600 | 3200 | ||||
248 | 2.082 | 4255 | 500 | SFW4000-12/2600 | 4000 | CJWT- II BWT-10000 | ||
287 | 2.237 | 5291 | SFW5000-12/2600 | 5000 | ||||
CJA475-W-140/2x14 | 116 | 1.429 | 1366 | 300 | SFW1250-20/2600 | 1250 | CJWT- II BWT-6000 | DN800 |
137 | 1.541 | 1739 | 333.3 | SFW1600-18/2600 SFW2000-18/2600 | 1600 | |||
157 | 1.662 | 2151 | 2000 | |||||
183 | 1.783 | 2688 | 375 | SFW2500-16/2600 | 2500 | |||
214 | 1.941 | 3422 | 428.6 | SFW3200-14/2600 | 3200 | |||
248 | 2.082 | 4255 | SFW4000-14/2600 | 4000 | CJWT- II BWT-10000 | |||
287 | 2.237 | 5291 | 500 | SFW5000-12/2600 | 5000 | |||
333 | 2.417 | 6632 | SFW6300-12/2600 | 6300 | ||||
400 | 2.495 | 8421 | 600 | SFW8000-10/2600 | 8000 | |||
CJA475-W-140 /2x16 | 114 | 1.851 | 1739 | 300 | SFW1600-20/2600 | 1600 | CJWT- II BWT-6000 | |
132 | 1.977 | 2151 | SFW2000-20/2600 | 2000 | ||||
153 | 2.132 | 2688 | 333.3 | SFW2500-18/2600 | 2500 | |||
179 | 2.32 | 3422 | 375 | SFW3200-16/2600 | 3200 | CJWT- II BWT-10000 | DN 1000 | |
207 | 2.495 | 4255 | SFW4000-16/2600 | 4000 | ||||
240 | 2.675 | 5291 | 428.6 | SFW5000-14/2600 | 5000 | |||
279 | 2.884 | 6632 | 500 | SFW6300-12/2600 | 6300 |
Product Pictures
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, How many an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com