Chengdu Forster Technology Co., Ltd.

Integrity, pragmatism, innovation, and provide the best solution for your hydro power plant.

Manufacturer from China
Active Member
6 Years
Home / Products / Hydro Turbine Governor /

High Oil Pressure Programmable Hydro Turbine Governor Control Devices 6300v

Contact Now
Chengdu Forster Technology Co., Ltd.
City:chengdu
Province/State:sichuan
Country/Region:china
Contact Person:MrsNancy
Contact Now

High Oil Pressure Programmable Hydro Turbine Governor Control Devices 6300v

Ask Latest Price
Video Channel
Brand Name :Forster
Model Number :GYWT-1000-10
Certification :CE/TUV/ISO9001/From-E
Place of Origin :Sichuan, China (Mainland)
MOQ :1set
Price :Negotiable
Payment Terms :L/C, T/T
Supply Ability :30set/month
Delivery Time :90days
Packaging Details :wood box
Function 1 :Active power regulation
Function 2 :Fast automatic synchronization
Function 3 :Detection of electrical fault
Function 4 :Increase or decrease load and load operation
Function 5 :Guide vane opening
Function 6 :Adopt PID intelligent control
Keyword :Hydro Turbnine Governor
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

6300v High Oil Pressure Programmable Turbine Governor For Hydro Power Plant

Main Products:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features:

The turbine governor is one of the most important auxiliary control devices for hydroelectric generating sets. Its quality of operation directly determines the safe and stable operation of the unit. Reducing the failure rate of the turbine governor is the most effective means to improve the operational reliability of the unit.

As the important equipment of hydropower plants, hydraulic governor plays a key role in the normal operation of hydropower stations, and is inseparable from the normal power generation of hydropower stations. Once the governor fails, it will directly affect the turbines and even the power system. Safe and stable operation, therefore the hydropower station staff pays attention to the commissioning and maintenance of the turbine governor, timely commissioning, overhauling and maintaining the turbine governor, in order to avoid the problems of the turbine governor to the greatest extent, and thus ensure the normal operation of the hydropower station.

1. measure the frequency of the unit and the power grid, and realize the frequency regulation of the unit when it is running without load or in isolation;

2. when no load is on, the unit frequency automatically tracks the power grid frequency, which is convenient for rapid automatic synchronization;

3. manually start and stop, increase and decrease load, and operate with load;

4. automatically start and stop the machine, and automatically adjust unit output according to permanent slip (bp) after grid connection;

5. switch automatically and manually unconditionally and without disturbance;

6. main parameters and operation status of speed regulators such as machine frequency, network frequency, guide blade opening, manual and automatic are displayed on the display screen;

7. able to set the operating parameters of the governor through the display screen;

8. when an electrical fault is detected, it can be automatically cut to manual and the load can be fixed in the state before the fault.

9. high reliability programmable controller (PLC), small size, strong anti-interference ability, and an average trouble-free time of more than 300,000 hours;

10. software frequency measurement can meet the requirements of timing and accuracy of frequency measurement;

11. PID intelligent control, with good stability and adjustment quality

Product pictures:

High Oil Pressure Programmable Hydro Turbine Governor Control Devices 6300v

Company Information:

Our workshop

Advantages:

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com

Inquiry Cart 0