Chengdu Forster Technology Co., Ltd.

Integrity, pragmatism, innovation, and provide the best solution for your hydro power plant.

Manufacturer from China
Active Member
6 Years
Home / Products / High Head Water Turbine /

34.2-276KW Impact High Head Water Turbine Micro Pelton Wheel Generator

Contact Now
Chengdu Forster Technology Co., Ltd.
City:chengdu
Province/State:sichuan
Country/Region:china
Contact Person:MrsNancy
Contact Now

34.2-276KW Impact High Head Water Turbine Micro Pelton Wheel Generator

Ask Latest Price
Video Channel
Place of Origin :Sichuan, China (Mainland)
Brand Name :forster
Model Number :CJ237
Supply Ability :50 Set/Sets per Month
Packaging Details :Wooden Box
MOQ :1 Set/Sets
Price :Negotiable
Certification :CE/TUV/ISO9001/From-E
Payment Terms :L/C, T/T
Delivery Time :90days
Designer head :50-280 m
Traffic :0.086-0.176m / s
Design speed :477-992 r / min
Power :34.2-276KW
Driving mode :Straight league,Between the united
Diameter :200 mm
Material :Stainless Steel
Type :Water power
Keyword :Micro hydro power plants
Port :Shanghai/Shenzhen
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Cheap Price High Water Head Micro Pelton Turbine Generator For Hydro Power Plants

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features:

1. The impact turbine is a special hydraulic propulsion mechanism that draws a free jet with kinetic energy, rushes to the runner bucket, and rotates the runner to do work, thereby completing a hydraulic prime mover that converts water energy into mechanical energy. In the impact turbine, the difference between the working jet and the relative position of the runner and the number of work can be divided into a tapping turbine, a slanting turbine and a double-click turbine.

2. Theoretical analysis proves that the efficiency is highest when the circumferential speed at the pitch circle is about half of the jet velocity. When the load changes, the direction of the water inlet speed of the runner is constant. In addition, the turbines are used in the high-head power station. The head change is relatively small and the speed changes little, so the efficiency is less affected by the load change. The efficiency curve is relatively flat and the highest efficiency is over 91%.

Product parameters:

Turbine parameters Generator parameters Other detailed parameters
Model Design head(m) Under the design head Design speed(r/min)

power

(kw)

rated speed

(r/min)

runaway

speed(r/min)

For other detailed parameters and requirements, please consult the business personnel

traffic

(m/s)

the output(kw)

CJ237-W-55/1*6

Turbine performance data

50 0.086 34.2 477 26 1000 1800
60 0.095 45 533 40 1000 1800
70 0.102 56.8 576 55 600 1320
80 0.109 69.4 615 55 600 1320
90 0.116 81.7 655 75 600 1320
100 0.122 96.5 685 100 750 1650
110 0.128 112 720 100 750 1650
120 0.133 127 750 125 750 1650
130 0.139 142 785 125 750 1650
140 0.144 158 805 160 750 1350
150 0.149 174 835 160 750 1350
160 0.154 190 866 160 750 1350
170 0.159 212 890 200 1000 1800
180 0.163 232 920 200 1000 1800
190 0.167 253 947 250 1000 1800
200 0.172 275 970 250 1000 1800
210 0.176 296 992 250 1000 1800

Product pictures

34.2-276KW Impact High Head Water Turbine Micro Pelton Wheel Generator34.2-276KW Impact High Head Water Turbine Micro Pelton Wheel Generator

Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website. website address: www.fstgenerator.com

Inquiry Cart 0