Chengdu Forster Technology Co., Ltd.

Integrity, pragmatism, innovation, and provide the best solution for your hydro power plant.

Manufacturer from China
Active Member
6 Years
Home / Products / Pelton Turbine Generator /

Micro Hydraulic Hydro Pelton Turbine Generator 50 KW 100 KW 200 KW 500 KW

Contact Now
Chengdu Forster Technology Co., Ltd.
City:chengdu
Province/State:sichuan
Country/Region:china
Contact Person:MrsNancy
Contact Now

Micro Hydraulic Hydro Pelton Turbine Generator 50 KW 100 KW 200 KW 500 KW

Ask Latest Price
Video Channel
Brand Name :Forster
Model Number :CJA237/475-W-140
Certification :From-E/CE/TUV/ISO9001
Place of Origin :Sichuan, China (Mainland)
MOQ :1 Set/Sets
Price :USD121000-181500/set
Payment Terms :L/C, T/T
Supply Ability :50 Set/Sets per Month
Delivery Time :120days
Packaging Details :Wood box
name :pelton turbine generator
Voltage :6.3kv/10kv/20kv/35kv
Frequency :50Hz/60Hz
Generator type :3 Phase AC
Power :5300 KW
Governor :High Hydraulic Microcomputer Governor
Runner material :stainless steel
Keyword :pelton turbine
Port :SHANGHAI,SHENZHEN,GUANGZHOU
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

50 KW 100 KW 200 KW 500 KW Micro Hydraulic Hydro Pelton Turbine Generator

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features:

Impact water turbine(pelton turbine) is a hydraulic prime mover that converts water energy into mechanical energy by drawing a free jet with kinetic energy by means of a special water guiding mechanism, rushing to the runner water bucket, and rotating the runner to do work. In impact turbines, the relative positions and working times of working jets and runners can be divided into impact turbines, oblique turbines, and double-click turbines.

Pelton turbines use high-speed water to “shock” the runners to do work. The water flow enters the turbine from the pressurized water pipe and forms a high-speed jet through the nozzle.

1. suitable for high head,small flow and flow changes in large runoff hydropower station.

2. With the power plant investment is small,compact units structure characteristics.

3. Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

4. Suitable for high head,small flow station in mountainous area.

5. A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

Product parameters:
Pelton tubine generator unit Generator Gevernor or Regulating work Valve
Turbine
Type Water head(m) Discharge (m³/s) Output(kw) Speed (r/min) Type Capacity (kw)
CJA475-W-125/2x14 137 1.541 1739 375 SFW1600-16/2600 1600 CJWT- II BWT-6000 DN800
157 1.662 2151 SFW2000-16/2600 2000
183 1.783 2688 428.6 SFW2500-14/2600 2500
214 1.941 3422 SFW3200-14/2600 3200
248 2.082 4255 500 SFW4000-12/2600 4000 CJWT- II BWT-10000
287 2.237 5291 SFW5000-12/2600 5000
CJA475-W-140/2x14 116 1.429 1366 300 SFW1250-20/2600 1250 CJWT- II BWT-6000 DN800
137 1.541 1739 333.3 SFW1600-18/2600 SFW2000-18/2600 1600
157 1.662 2151 2000
183 1.783 2688 375 SFW2500-16/2600 2500
214 1.941 3422 428.6 SFW3200-14/2600 3200
248 2.082 4255 SFW4000-14/2600 4000 CJWT- II BWT-10000
287 2.237 5291 500 SFW5000-12/2600 5000
333 2.417 6632 SFW6300-12/2600 6300
400 2.495 8421 600 SFW8000-10/2600 8000
CJA475-W-140 /2x16 114 1.851 1739 300 SFW1600-20/2600 1600 CJWT- II BWT-6000
132 1.977 2151 SFW2000-20/2600 2000
153 2.132 2688 333.3 SFW2500-18/2600 2500
179 2.32 3422 375 SFW3200-16/2600 3200 CJWT- II BWT-10000 DN 1000
207 2.495 4255 SFW4000-16/2600 4000
240 2.675 5291 428.6 SFW5000-14/2600 5000
279 2.884 6632 500 SFW6300-12/2600 6300

Product pictures:

Micro Hydraulic Hydro Pelton Turbine Generator 50 KW 100 KW 200 KW 500 KWMicro Hydraulic Hydro Pelton Turbine Generator 50 KW 100 KW 200 KW 500 KW

Installation picture:

Micro Hydraulic Hydro Pelton Turbine Generator 50 KW 100 KW 200 KW 500 KW

Company Information

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4, Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, How many an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6, How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7, Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com

Inquiry Cart 0