
Add to Cart
High Efficiency Low Head Water Turbine Renewable Energy Power Plant
Product Description
Axial flow turbine(so called kaplan turbine) generator unit is widely used for low water head such as small river, small dam, etc. The mini axial turbine generator is made by generator and Impeller coaxial. Working principle and installation method: Choose suitable installation place ( riverside, rocky place of downstream river),use concrete and stone to build water channels; use wood to make a water gate; use barbed wire to make filter; use concrete and stone to make spiral case; build trumpet-style draft tube under the spiral case; the draft tube should be covered and under water 20-50m. The length of draft tube is the water head. The mini axial turbine generator is suitable for water head 1-6m.
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Kaplan turbine has below advantages:
1. Suitable for develop low head large flow rate hydro power.
2. Could be running steadily in changable flow
3. Kaplan turbine is a vetical model, economic and easy to maintain.
Our kaplan turbine can be blade fixed model and balde adjustable model, and it has equipped governor that makes cusomter able to control the power and speed on contorl panel. The efficiency of our kaplan turbine could reach 97% and it can be off-grid and on-grid running, the control system is full automatic.
Product parameters:
ZD760-LM-80 Hydro Kaplan Tubine Performance Data And Supporting Table | ||||||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | ||||||||
Design head(m) | Under the design head | Design speed (r/min) | Model | power (kw) | Rated voltage (v) | Rated electric current (A) | Rated speed (r/min) | The run way speed (r/min) | Manually | |||
Flow rate (m3/s) | The output(kw) | |||||||||||
ZD760-LM-80 = 4-5° | 2.2 | 1.76 | 33.5 | 334 | SF26-6/423 | 26 | 400 | 46.9 | 1000 | 2000 | Belt | TT-750 |
2.9 | 2.02 | 50.5 | 382 | SF40-6/423 | 40 | 400 | 72.2 | 1000 | 2000 | Belt | TT-750 | |
3.6 | 2.25 | 70.1 | 429 | SF55-6/493 | 55 | 400 | 99 | 1000 | 2000 | Belt | TT-750 | |
4.3 | 2.46 | 91.5 | 466 | SF75-6/493 | 75 | 400 | 136 | 1000 | 2000 | Belt | TT-750 | |
5 | 2.65 | 114.8 | 503 | SF100-12/850 | 100 | 400 | 181 | 500 | 1000 | Straight league | TT-750 | |
5.2 | 2.67 | 120 | 500 | SF100-8/590 | 100 | 400 | 181 | 750 | 1500 | Belt | TT-750 | |
6 | 2.74 | 142 | 500 | SF125-12/850 | 125 | 400 | 226 | 500 | 1000 | Straight league | TT-750 | |
ZD760-LM-80 = + 1 0° | 2.1 | 1.94 | 34.2 | 334 | SF26-6/423 | 26 | 400 | 46.9 | 1000 | 2000 | Belt | TT-750 |
2.6 | 2.16 | 47.1 | 382 | SF40-6/423 | 40 | 400 | 72.2 | 1000 | 2000 | Belt | TT-750 | |
2.7 | 2.19 | 49.7 | 429 | SF40-6/493 | 40 | 400 | 72.2 | 1000 | 2000 | Belt | TT-750 | |
3.3 | 2.44 | 67.7 | 466 | SF75-6/493 | 75 | 400 | 136 | 1000 | 2000 | Belt | TT-750 | |
4.3 | 2.68 | 90 | 503 | SF75-6/493 | 75 | 400 | 136 | 1000 | 2000 | Belt | TT-750 | |
5 | 3 | 126 | 500 | SF100-6/590 | 100 | 400 | 181 | 1000 | 2000 | Gear | TT-750 | |
5.5 | 3.13 | 144.7 | 500 | SF125-12/850 | 125 | 400 | 226 | 500 | 1000 | Straight league | TT-750 | |
ZD760-LM-80 = + 1 5° | 2 | 2.1 | 34.2 | 301 | SF26-6/423 | 26 | 400 | 46.9 | 1000 | 2000 | Belt | TT-1500 |
2.6 | 2.37 | 50.2 | 340 | SF40-6/423 | 40 | 400 | 72.2 | 1000 | 2000 | Belt | TT-1500 | |
3.2 | 2.65 | 69.1 | 380 | SF55-6/493 | 55 | 400 | 99 | 1000 | 2000 | Belt | TT-1500 | |
3.9 | 2.92 | 92.8 | 429 | SF75-6/493 | 75 | 400 | 136 | 1000 | 2000 | Belt | TT-1500 | |
4.8 | 3.06 | 120.1 | 429 | SF100-6/590 | 100 | 400 | 181 | 1000 | 2000 | Gear | TT-1500 | |
5.4 | 3.13 | 141.2 | 500 | SF125-12/850 | 125 | 400 | 226 | 500 | 1000 | Straight league | TT-1500 | |
6 | 3.54 | 174 | 500 | SF160-12/850 | 160 | 400 | 288 | 500 | 1000 | Straight league |
Design schematic:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4, Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6, How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7, Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website:www.fstgenerator.com