
Add to Cart
High Head Pelton Turbine Generator 100KW Pelton Wheel Electric Jet Water Turbine
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Pelton Wheel Product Features:
1. Suitable for high head,small flow and flow changes in large runoff dropower station;
2. With the power plant investment is small,compact units structure characteristics;
3. Has the efficiency changes smoothly,opersting a wide range,even in the 15%-20% load is reduced efficiency;
4. Suitable for high head,small flow station in mountainous area;
5. A unit constatraction,simple restaction without cavitation condtion,the advantages of stable operation,less investment,constucion area.
Pelton Wheel Product Parameters:
Pelton Wheel tubine generator unit | Generator | Gevernor or Regulating work | Valve | |||||
Turbine | ||||||||
Type | Water head(m) | Discharge (m³/s) | Output(kw) | Speed (r/min) | Type | Capacity (kw) | ||
CJA237/475-W-90/2x7 | 245 | 0.51 | 1084 | 750 | SFW1000-8/1180 | 1000 | BWT-10000 | DN400 |
283 | 0.55 | 1346 | SFW1250-8/1180 | 1250 | ||||
333 | 0.6 | 1718 | SFW1600-8/1430 | 1600 | ||||
393 | 0.65 | 2152 | SFW2000-8/1430 | 2000 | ||||
449 | 0.69 | 2689 | 1000 | SFW2500-6/1430 | 2500 | |||
529 | 0.75 | 3439 | SFW3200-6/1730 | 3200 | ||||
CJA237/475-W-100/2x7 | 452 | 0.7 | 2686 | 750 | SFW2500-8/1730 | 2500 | BWT-10000 CJWT- II | DN400 |
532 | 0.76 | 3441 | 1000 | SFW3200-6/1730 | 3200 | |||
614 | 0.81 | 4301 | SFW4000-6/1730 | 4000 | ||||
710 | 0.87 | 5348 | SFW5000-6/1730 | 5000 | ||||
CJA237/475-W-110/2x9 | 203 | 0.77 | 1352 | 500 | SFW1250-12/1430 | 1250 | BWT-10000 CJWT- II | DN500 |
238 | 0.84 | 1716 | 600 | SFW1600-10/1430 | 1600 | |||
277 | 0.9 | 2154 | SFW2000-10/1730 | 2000 | ||||
322 | 0.97 | 2691 | SFW2500-10/1730 | 2500 | ||||
378 | 1.05 | 3434 | 750 | SFW3200-8/1730 | 3200 | |||
439 | 1.13 | 4298 | SFW4000-8/1730 | 4000 | ||||
CJA237/475-W- 110/2x11 | 155 | 1.01 | 1359 | 428.6 | SFW1250-14/1730 | 1250 | BWT-10000 CJWT- II | DN600 |
181 | 1.09 | 1719 | 500 | SFW1600-12/2150 | 1600 | |||
210 | 1.17 | 2144 | SFW2000-12/2150 | 2000 | ||||
244 | 1.26 | 2691 | 600 | SFW2500-10/2150 | 2500 | |||
288 | 1.37 | 3450 | SFW3200-10/1730 | 3200 | ||||
300 | 1.4 | 3535 | SFW3200-10/1730 | 3200 | ||||
320 | 1.45 | 3926 | SFW4000-10/2150 | 4000 | ||||
340 | 1.49 | 4317 | SFW4000-8/2150 | 4000 | ||||
360 | 1.54 | 4702 | 750 | SFW4000-8/2150 | 4000 | |||
380 | 1.58 | 5082 | SFW5000-8/2150 | 5000 | ||||
400 | 1.62 | 5469 | SFW5000-8/2150 | 5000 |
Product pictures:
Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Europe, Asia, South America, North America, etc., and as partners, we are qualified as long-term suppliers in many regions.
The capacity of hydro turbines is up to 50KW-30MW for a unit. The main hydro turbines areTurgo turbine ,pelton turbines, francis turbines, kaplan turbines ,bulb tubular turbines and other types of turbines.Foster also supplies governors, valves, transformers, monitoring systems, microcomputer integrated control panels and other equipment for hydroelectric power plants.
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4, Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6, How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7, Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com