Chengdu Forster Technology Co., Ltd.

Integrity, pragmatism, innovation, and provide the best solution for your hydro power plant.

Manufacturer from China
Active Member
6 Years
Home / Products / Hydro Turbine Generator /

Straight League Francis Hydro Turbine Generator Hydroelectric Power 100KW To 1000KW

Contact Now
Chengdu Forster Technology Co., Ltd.
City:chengdu
Province/State:sichuan
Country/Region:china
Contact Person:MrsNancy
Contact Now

Straight League Francis Hydro Turbine Generator Hydroelectric Power 100KW To 1000KW

Ask Latest Price
Video Channel
Brand Name :Forster
Model Number :HL220-WJ-50
Certification :ISO9001/CE/TUV/From-E
Place of Origin :Sichuan, China (Mainland)
MOQ :1 Set/Sets
Price :Negotiable
Payment Terms :L/C, D/A, T/T, D/P, Western Union, MoneyGram
Supply Ability :50 Set/Sets per Month
Delivery Time :90days
Packaging Details :Wooden box
Design Head :15.8m to 71m
Design Flow :1.08 m³/s to 2.405 m³/s
Power :125KW to 1150KW
Connection method :Straight league
Color :According to customer choice
Volute Material :Carbon steel
Runner Material :Stainless steel
Excitation device :5 in 1 integrated control panel
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Hydro Turbine Generator Francis Turbine Hydroelectric Power 100KW To 1000KW

Francis turbine is a kind of turbine suit to water head 20-300meters and with certain suitable flow.


It could be divided into vertical and horizontal arrangement. Francis turbine have the advantage of high efficiency, small size and reliable structure.


Horizontal Francis turbine unit, with horizontal shaft, could be 2 or three supports. Which is normally one stair arrangement. Simple structure, easier operation and maintainence.

Vertical Francis turbine unit, with vertical shaft, metal spiral case or concrete spiral case. With adjustable guide vane, and stay ring etc parts, are suit to runner diameter bigger than 1000mm. Our engineer will select the most suitable Francis turbine for your hydro power project.

.

Hydro Turbine Francis​ Product parameters:
HL220-WJ-50 turbine performance data and supporting table
Model Turbine Parameters Generator Parameters Driving mode
Design head(m) Under the design head Design speed (r/min) The power of generator Rated speed(r/min)
Flow rate (m3/s) The output(kw)
HL220-WJ-50 15.8 1.08 140 546 125 600 Direct Connection
18.5 1.186 179 591 160 600
21.3 1.3 223 634 200 600
24.8 1.353 276 684 250 750
29 1.486 351 740 320 750
33.6 1.633 441 796 400 750
39.3 1.711 544 861 500 1000
45.2 1.827 680.4 924 630 1000 Direct Connection
52.8 2.011 864 998 800 1000
61 2.2 1080 1073 1000 1000
71 2.405 1342 1158 1250 1000

Hydro Turbine Francis ​Product pictures:

Straight League Francis Hydro Turbine Generator Hydroelectric Power 100KW To 1000KWStraight League Francis Hydro Turbine Generator Hydroelectric Power 100KW To 1000KW

Company Information

Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Europe, Asia, South America, North America, etc., and as partners, we are qualified as long-term suppliers in many regions.

The capacity of hydro turbines is up to 5KW-300MW for a unit. The main hydro turbines are Turgo turbine ,pelton turbines, francis turbines, kaplan turbines ,bulb tubular turbines and other types of turbines.Foster also supplies governors, valves, transformers, monitoring systems, microcomputer integrated control panels and other equipment for hydroelectric power plants.

Our workshop

Straight League Francis Hydro Turbine Generator Hydroelectric Power 100KW To 1000KW

Advantages

Straight League Francis Hydro Turbine Generator Hydroelectric Power 100KW To 1000KW

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4, Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, How many an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6, How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7, Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com

Inquiry Cart 0